CRBS IT Status Blog

Aproximate Time

Event

Notes

Wed., Sept. 30th, 2009
8pm PDT

Rehosting of primary DNS server

No interruption of Domain Name resolution is expected

COMPLETED
Thurs., Sept. 17th, 2009
5pm-9pm PDT

Power interruption at SDSC to facilitate upgrade of Emergency Power Off switch

Downtime for CRBS equipment varies from no interruption to down for the duration.  We are working to acquire additional hardware that will either shorten or eliminate the outage for most servers.  Some servers, particularly the CRBS cluster and the CCDB cluster, including non-cluster machines located in those racks, will be unavailable for the duration of the power interruption.  A list of affected servers, and the extent to which they will be impacted can be found here .

Sat.-Sun., Sept. 12-13, 2009

Upgrade of server and software for Jira, Confluence, Crowd and Fisheye/Crucible

 

Tues., Aug. 18, 2009
9pm - midnight

Upgrade of bamboo.crbs.ucsd.edu build test server from version 2.2.3 to version 2.3

Go here for more details of the new version.

COMPLETED
Sun.,, Aug. 16,  6pm -
Mon., Aug. 17, 7am

Production Oracle RAC database server is being patched and moved from the nbirn.net domain to the crbs.ucsd.edu domain.  During this outage, status information can be found at http://support.crbs.ucsd.edu and/or http://status.crbs.ucsd.edu

As of 7:14 am, the Oracle RAC upgrade and domain name change are complete. 
At this time, all Oracle RAC databases are back online and functioning nominally.

As of 3:35am, upgrade was progressing, but not yet complete.  Next update will be at 7am, Monday, August 17th.

For applications:
   * if you use an IP,  you must change it to a FQDN (Fully Qualified
     Domain Name) that has "crbs.ucsd.edu" in it.    
   * If you use an FQDN that has "nbirn.net" in it, you must change it
     to the appropriate/analogous "crbs.ucsd.edu" FQDN.
Examples of where modifications might be needed include properties files that configure jdbc connections and tnsnames.ora files that configure oracle clients.
You can go ahead and make any necessary changes to applications at your convenience, prior to the work Sunday night, as the new entries are already in DNS.

Sunday, July 19, 2009 1:30pm - 8:00pm

Changes to network infrastructure at SDSC.  These changes affected every server/service hosted at SDSC.  Most experienced only a simple, if extended, loss of network connectivity.  However, the Oracle RAC had to be restarted.

Completed except for restart of Oracle RAC and verification of any systems that use it.

Wednesday, June 10
12:00 to Thursday June 11 10:00am

Upgrade of dev VM environment for the following servers:
ccdb-dev-gama2.crbs.ucsd.edu
ccdb-dev-mcathost.crbs.ucsd.edu
dev-apache-crowd.crbs.ucsd.edu
noc-afs
satr-dev-portal.crbs.ucsd.edu
vrowley-dell.adtest.ucsd.edu
This outage is necessary to enable 64 bit virtulization on the server and to begin the migration to vSphere
These servers and their services will be unavailable until the updates are complete. 

COMPLETED
noc-afs not converted
satr-dev-portal.crbs.ucsd.edu moved to vm-dev-3
ccdb-dev-gama2.crbs.ucsd.edu
ccdb-dev-mcathost.crbs.ucsd.edu
dev-apache-crowd.crbs.ucsd.edu
upgraded, tools installed and brought back up.
64 bit is now enabled on the VM host

Friday, May 22, 2009 11pm-1:00am PDT

UCSD Campus phone upgrades.  Campus telephone service will be unavailable during the upgrade.

COMPLETED
After the upgrade, you may have to reset the "Accept 2nd Call" feature, enable the "Follow Me" (2) feature, or enable the "External Call Forward" (23) feature on your phone.  Also, the message waiting indication for analog phones will be changed from the elevated dial tone to a pulsating dial tone.

Thursday, May 21, 2009 10:00-11:45 pm PDT

SCOPE: Network hardware and IOS upgrades and router reloads.
IMPACT: Rolling outages of attached networks during this maintenance window.  Intermittent connectivity loss of approximately 10 minutes during this window can be expected.  This includes both wired and wireless networks in the following areas :

COMPLETED
Affected areas include:
Node-A
 Muir-Biology
 Cognitive Sciences
 Chemistry Research
 Economics
 Eucalyptus Point
 Faculty Club
 Hopkins Parking
 HSS
 Institute of the Americas
 International Relations/Pacific Studies
 Mandeville
 Mandler
 McGill
 Rady School of Mgmt
 Pangea Parking
 Peterson
 RIMAC
 Sequoyah
 Social Sciences
 Solis
 Thurgood Marshall Admin
 UNEX
 
 ResNet Areas : ERC, Thurgood Marshall, Muir
Node-K
 Campus Services Complex - All Buildings
Node-V
 BSB
 CMG
 CMME
 CMMW
 FMRI
 Leichtag
 MTF
 SOM- Trailers (Ash,Evergreen,Holly,etc..)
 Stein
SIO
 All Buildings at SIO
 
 Resnet Area : Coast Apts.

May 6, 2009 10:00pm-11:00pm PDT

SCOPE: Network hardware upgrade and router reload.

IMPACT: Outages of attached networks during this maintenance window.  Intermittent connectivity loss of approximately 15 minutes during this window can be expected.  This includes both wired and wireless networks in buildings serviced via Node-S.

COMPLETED
Node-S
 Bldgs. 301,302,303,309,400
 Career Services
 Center Hall
 International Center
 Student Health
 Student Services

May 2, 2009  5:30am-6:30am PDT

SCOPE: Network hardware upgrades and router reloads.  This is the 2nd of 2 upgrades scheduled.

IMPACT: Rolling outages of attached networks during this maintenance window. 
               Intermittent connectivity loss of approximately 10 minutes during this window can be expected.

CalIT Building (aka Atkinson Hall) will be affected!

RESCHEDULED

Apr. 30, 2009 10pm-11:45pm PDT

SCOPE: Network hardware upgrades and router reloads. This is the 1st of 2 upgrades scheduled.

IMPACT: Rolling outages of attached networks during this maintenance window.
               Intermittent connectivity loss of approximately 10 minutes during this window can be expected.
               This includes both wired and wireless networks. 
              
Basic Sciences Building and Holly Building will definitely be affected!   Email may be delayed.

COMPLETED

April 28, 2009 4:550pm PDT

A problem with connectivity to NCMIR home directories is being addressed.

CORRECTED:  April 28, 2009  5:13pm PDT

Apr. 18, 2009 8pm PDT

Upgrades to Jira, Confluence and Crowd websites to shorten URLs and improve performance.
Users who are experiencing problems logging into Jira should:

  • email support_at_crbs.ucsd.edu and cc: vrowley_at_ucsd.edu
  • include the username you login with

COMPLETED:  Apr. 19, 2009 8pm
NOTE:  New URLs
    Crowd Single Sign-On:  http://crowd.crbs.ucsd.edu
    Confluence Wiki:           http://confluence.crbs.ucsd.edu
    Jira Tracking System:    http://support.crbs.ucsd.edu
                                          (http://jira.crbs.ucsd.edu also works)

Apr. 13, 2009 6am PDT

SDSC Network upgrades - minimal disruption expected as we are switched from one main router to another

COMPLETED:  No impact reported.